bench excavation
基本解释
- 台阶式挖掘
英汉例句
- The bench excavation of combining short-hole with deep-hole blasts was adopted.
采用了浅孔和中深孔爆破相结合的台阶开挖方法。 - In the excavation of foundation pit and foundation bench in shallow aquifer area, the problem of dewatering will be involved.
在含水层较浅的地区开挖基坑及基槽,都涉及到降水问题。 - The construction technique of deep-hole bench blasting and presplitting blasting applied for excavation of Dadingzhishan Lock engineering is described.
介绍大顶子山船闸工程闸塘石方开挖中深孔梯段爆破、预裂爆破施工技术。
双语例句
词组短语
- rock bench excavation 岩台开挖
- heading and bench excavation 导洞与台阶开挖
- top heading and bench excavation 上下台阶开挖
- Tri -bench excavation method 三台阶开挖法
- three -bench seven-step excavation method 三台阶七步开挖法
短语
专业释义
- 台阶开挖
On the upper bench excavation, the length is about 6-8m in vertical direction which the fractured zones is affected by blasting vibration.
上台阶开挖时,爆破振动对松动区的影响在纵向开挖距离约为6-8m,松动区稳定后厚度约为2.2m;而在下台阶开挖时,这个距离增大为8-10m。动力与电气工程
- 台阶开挖