base-load plant
基本解释
- [动力与电气工程]基荷发电厂
英汉例句
- The power supply cost of hydraulic power plant for base load is lowest, hydraulic power plant for peak load and coal-fired power plant next, nuclear power plant highest.
担负基本负荷的水电站方案和燃煤火电站方案供电成本最低; - Once the concept is shown to be feasible, the developers can then build on the smaller facilities to form a larger base-load plant.
FORBES: After Fukushima, U.S. Seeks to Advance Small Nuclear Reactors
双语例句
权威例句
专业释义
- 基荷发电厂